Interior finishing of MoA Central Facility Building

  • Project start date: 06 10 2015
  • Project finish date: 07 04 2016
  • Area of the building: 1335 sq.m

Since different phases of the construction of MoA laboratory were given to different subcontractors by CH2M, our company received the interior finish contract. The following major processes were completed by our crews during the interior finish work:

  • Interior partitions – GB partitions, completed according to Knauf standrards.
  • Ceilings – implemented with suspended ceilings (120x60cm mineral material tiles)
  • Interior doors and hardware – aluminum and steel doors (antipanic and common hardware)
  • Partition finishes – painting (epoxy paints), ceramic tiles, plastering
  • Flooring – vinyl seamless floors, ceramic tiles
  • Stair finishes and handrails made of stainless steel
  • Toilet and shower partitions made of HPL plastic
  • Window finishes – sills made of waterproof laminate
  • Attic stairs and a special mechanism trapdoor to the attic floor
  • Interior windows and glass partitions and pass-through windows (aluminum, stainless steel)